Chicago contractor marketing that gets you onto developer bid lists
Developers and institutional owners shortlist general contractors from what they can verify in ten minutes. We build that verifiable record first, and the campaigns second.
- $6.9B of permitted Chicago work in 2025
- License class stated up front
- M/WBE participation documented
- Project films by building type
Prepared for general contractors bidding Chicago work. License data checked 3 October 2026.



Site film and photography by our crew, YPERIA Properties and Magna Graecia.
Where Chicago built in 2025
Every building permit the City issued last year, by community area. This is where the bid invitations come from, and where your project pages and campaigns should point.
- 1West Town$690M72 permits
- 2Near West Side$687M82 permits
- 3O'Hare$197M7 permits
- 4Near North Side$128M58 permits
- 5North Center$107M75 permits
- 6South Chicago$103M5 permits
- 7Humboldt Park$96M56 permits
- 8Garfield Ridge$79M13 permits
- 9North Lawndale$70M80 permits
- 10South Deering$70M5 permits
Most permits are small; most of the money is in a few dozen large jobs. A GC moving up a class needs a record that owners of those jobs can check.
Which Chicago license class does the job need?
Since January 2026 the City raised the project limits for Classes B, C and D. If your site still shows your old ceiling, owners size you too small.
- Project limit
- Up to $4 million
- Insurance tier
- $2 million per occurrence
In 2025 the City issued 1,259 new construction and renovation permits in this value band, worth about $1.54 billion in reported cost.
Put your class, license number and insurance tier on your website and every profile. It is the first thing an owner's rep checks.
Seven people vet you before the invite goes out
Each has one question. Your public record either answers it or sends them to the next firm.
Has this firm built our building type, at our size, inside the city?
What has to be on your recordOne page per completed job: building type, neighborhood, contract value band, delivery method, your role and the year it closed.
Does the City of Chicago license class cover this contract value?
What has to be on your recordYour class and license number on the site, plus the insurance tier that goes with it.
Will this team hold the schedule the loan was sized on?
What has to be on your recordStart and completion dates for past jobs, the superintendent who ran each one, and progress footage that shows a site under control.
Can this GC help us hit the participation commitments?
What has to be on your recordPlan Commission projects commit to 26% MBE, 6% WBE and 50% city resident hiring. Show your certification if you hold one, the certified subs you bid with, and results you are allowed to share.
Will this builder protect the design?
What has to be on your recordDetail photography of finished work, short films with the architects you have built for, and how you handle submittals.
What about safety, bonding and public work?
What has to be on your recordA safety page with your program and incident record, bonding capacity in a range, and public projects listed by owner.
Which firms come back for “general contractors for 8-story rental buildings in Chicago”?
What has to be on your recordThe same facts as above, in plain sentences, repeated consistently on every profile you control.
A bid-list record in about 90 days
Audit what an owner's rep sees
We search your firm the way a project manager would and agree which building types you want more of.
Write the project library
Five to fifteen job pages with real values, dates and roles. No adjectives standing in for facts.
Film two or three jobs
Our crew shoots active sites and a finished building, so the films hold up in a developer's pitch room.
Put it in front of the invite list
LinkedIn and search aimed at developers, owner's reps and facilities teams, with a keep, change or stop call every month.

“Developers hire the contractor they already believe. I would rather spend your first month publishing ten honest project pages than running a single ad.”Kirill Samarits, founder and CEO
What a contractor program costs
Website rebuilt around project pages
$25,000 to $50,000Your project library, license, safety and team, owned by you.
Capability film
$15,000 to $50,000Active sites and finished buildings, shot by our crew.
Search and LinkedIn
From $3,000 a monthStop after any 30-day decision point.
What Chicago GCs ask us
Does the January 2026 license change matter for marketing?
+
Yes. The project limits for Classes B, C and D doubled, so a Class C firm can now carry jobs up to $10 million. If your site still describes you by your old ceiling, owners will size you too small. Update the class, the limit and the insurance tier everywhere.
We are a Class E or D firm. Is this worth it for us?
+
It can be, if the goal is moving up a tier. The record we build is what helps a Class D firm win its first $3 million job. Start with search and the project library on the lowest search tier rather than a full program.
How do we show M/WBE capability without overstating it?
+
List your certification only if you hold it, and name it exactly. Then show the certified firms you actually bid with and any participation numbers a past client has cleared. We never write a percentage you cannot document.
Can you film on an active Chicago job site?
+
Yes, with the GC's site safety rules, PPE and an escort. We plan shots around pours and crane picks so the crew is never in the way, and we get the owner's sign-off before anything is published.
Where is construction happening in Chicago?
+
By value, West Town and the Near West Side led new construction in 2025, at about $690 million each in reported cost, and the Loop led renovation at about $1.08 billion across 505 permits. Citywide the City issued 1,460 new construction permits worth $2.99 billion and 5,505 renovation permits worth $3.89 billion (City of Chicago building permits data).
What does a contractor program cost?
+
Rebuilding the website around project pages falls in our $25,000 to $50,000 (websites start at $9,000) website band. A capability film runs $15,000 to $50,000. Ongoing search or LinkedIn work begins from $3,000 monthly, and you can stop after any 30-day decision point.
Sources: City of Chicago Department of Buildings, general contractor license classifications, accessed October 2026; City of Chicago Department of Buildings, general contractor license changes for 2026; Chicago Plan Commission and Department of Planning and Development, M/WBE and local hiring update, 18 July 2024. Written by Kirill Samarits, founder and CEO of TERAMOK, Chicago. Related: construction marketing, contractor websites, Chicago development pipeline.
Tell us which developers you want to bid for
Bring your license class and the three jobs that best show your work. We will show you what an owner's rep finds today and what we would publish first.
Clients stay with us for years. Here is why.
Unprompted reviews from developers, architects and brands we work with. Each one links to the platform that hosts it, so you can read it in full.
From managing our social media to helping us build and refine our brand's online presence, their creativity, professionalism, and attention to detail have been exceptional. After nearly five years, I can confidently say they're more than just a marketing agency, they've become a trusted part of our team.
I was impressed by their aesthetic and knowledge of the architecture and real estate development sector.
CEO, FA Architecture and PartnersRebranding and social media, 2024 to 2025 · Verified reviewThey helped us build our brand identity from the ground up and developed a clear content plan.
G. K.Brand identity and content client · July 2026Been working with them for the past two years, they are very talented and hardworking. Great results in every field
Dimitris OikonomouClient for two years · September 2026
Campaign creative that sells real estate
Every visual is art directed for a job in the funnel: an ad, a launch page, a print placement or the sales gallery. Tap the speaker on any film to hear it.

Seasonal campaign creative for Chicago
Art direction and aerial film · Chicago
Art directed as the hero visual for winter campaigns: the Loop, Streeterville and Navy Pier at sunset as Lake Michigan freezes.
Used for Landing page heroes, paid social, seasonal listing launches

Founder-led ad for lead generation
Kirill Samarits, Founder and CEO · Chicago
Art directed to run as a founder-led ad and to open sales calls: why every launch starts with the brand, and how the brand turns into reservations.
Used for Paid social ads, sales calls, About page

Launch website for the sales gallery
TERAMOK launch website
The property website we built, used live in the sales gallery to walk buyers through exteriors, interiors and floor plans before they reserve.
Used for Sales gallery, presale reservations